Loading application…
Loading application…
The source does not give a direct link to this application. Search for reference 26/01740/FULL on Westminster City Council's planning pages, or see the Datahub record (raw JSON).
Partial demolition, excavation and comprehensive refurbishment of the existing building, including internal reconfiguration and alterations to floor levels; demolition of existing rear external staircase; erection of replacement fourth, fifth and sixth floor accommodation (including plant enclosure); erection of rear extensions and associated link structure; creation of a roof terrace; installation of green and blue-green roofs, plant equipment and quench pipes; replacement of the ground floor frontage, windows and doors; installation of a substation and cycle storage and photovoltaic panels; and associated works, in connection with the use of the building as a medical facility (Use Class E).
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 8 Nov 2026.
Data last updated 8 Nov 2026, 16:47 UTC. Councils are the authoritative record and may have changed since.