Replacement of the existing gas boilers in the basement plant room and an introduction of a hybrid system with 2no. new air source heat pumps installed at roof level. Relocation of 2no. existing Photo-Voltaic Panels and the addition of 2no. new Photo-Voltaic Panels at roof level