Loading application…
Loading application…
The source does not give a direct link to this application. Search for reference PA26/3033 on London Borough of Richmond upon Thames's planning pages, or see the Datahub record (raw JSON).
Replacement of gas-fired boilers with air source heat pumps to provide heating and hot water; installation of a rooftop air source heat pump acoustic compound; installation of solar PV panels; Replacement of gas-fired boilers with air source heat pumps to provide heating and hot water; installation of a rooftop air source heat pump acoustic compound; installation of solar PV panels; demolition of the existing cold-water storage tank room recovering of existing flat roof sections (excluding pool hall roof); and internal first floor modifications to provide access into the rooftop air source heat pump acoustic compound via a new door. Replacement of gas-fired boilers with air source heat pumps to provide heating and hot water; installation of a rooftop air source heat pump acoustic compound; installation of solar PV panels; demolition of the existing cold-water storage tank room, recovering of existing flat roof sections (excluding pool hall roof); and internal first floor modifications to provide access into the rooftop air source heat pump acoustic compound via a new door.
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 8 Nov 2026.
Data last updated 8 Nov 2026, 16:47 UTC. Councils are the authoritative record and may have changed since.