Loading application…
Loading application…
The source does not give a direct link to this application. Search for reference PP/24/07889 on Royal Borough of Kensington and Chelsea's planning pages, or see the Datahub record (raw JSON).
Reinstatement of windows on front and rear facade with double glazed `6 over 6' timber framed sash windows. Works to front lightwell including removal of timber staircase; reinstatement of flagstone paving; replacement of UPVC cladding with lime render; and installation of chrome extract flue to serve boiler within vault. Replacement of roof slates with Welsh slates; re-dressing of UPVC front dormer in lead; and replacement of UPVC windows to front dormer with double glazed timber framed units. Introduction of 2no. dormers to rear mansard; and internal refurbishment.
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 8 Nov 2026.
Data last updated 9 Nov 2026, 07:32 UTC. Councils are the authoritative record and may have changed since.