Loading application…
Loading application…
The source does not give a direct link to this application. Search for reference PP/24/06948 on Royal Borough of Kensington and Chelsea's planning pages, or see the Datahub record (raw JSON).
Reconfiguration of internal layout including replacement of 1st floor non-original carpet flooring with floating engineered timber flooring; replacement of tiles in kitchen and bathrooms; replacement of non-original wardrobes and joinery; replacement of all bathrooms and kitchens; replacement of electrical, lighiting plumbing, and heating services throughout; repair and full redecoration throughout; installation of rooflights; and removal of non-original redundant external pipes on rear elevation.
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 8 Nov 2026.
Data last updated 9 Nov 2026, 07:32 UTC. Councils are the authoritative record and may have changed since.