Loading application…
Loading application…
The source does not give a direct link to this application. Search for reference PP/24/00792 on Royal Borough of Kensington and Chelsea's planning pages, or see the Datahub record (raw JSON).
Installation of sustainable drainage measures, including attenuation tank, detention basins, swales, drainage chanels, berms flood walls, flood gates and raised tables; replacement of existing hardstanding with new paving, permeable paving and permeable asphalt; installation of raised planters and stepping logs; re-positioning of existing cycle racks and replacement of cycle storage facilities; and installation of external lighting.
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 8 Nov 2026.
Data last updated 9 Nov 2026, 07:32 UTC. Councils are the authoritative record and may have changed since.