Loading application…
Loading application…
The source does not give a direct link to this application. Search for reference PP/23/07816 on Royal Borough of Kensington and Chelsea's planning pages, or see the Datahub record (raw JSON).
Works to existing building to facilitate 33no of self-contained units to retain the existing C2 use (Residential institutions) resulting in the reduction of 35 bedspaces. Strip out and remodel of cluster flats and office space. Replacement of components and services throughout (windows, doors, kitchens, bathrooms, heating, lighting, flooring, redecorations), including stairwells and office space, relocated from basement to ground floor. Works include installation of MVHR systems, ASHP unit, PV panel installation to roof, formation of external terrace area, installation of entrance canopy and frontage, creation of access ramp and renewal of rainwater goods, soffits and fascias and associated works. ***WITHDRAWN***
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 8 Nov 2026.
Data last updated 9 Nov 2026, 07:32 UTC. Councils are the authoritative record and may have changed since.