Loading application…
Loading application…
The source does not give a direct link to this application. Search for reference PP/23/07735 on Royal Borough of Kensington and Chelsea's planning pages, or see the Datahub record (raw JSON).
Variation of condition nos. 2 (compliance with approved drawings), 3 (Construction Traffic Management Plan (CTMP)), 4 (Professional management of engineering works), 5 (Considerate Constructors Scheme (CCS)), 6 (Code of Construction Practice), 7 (Small-scale ground gas and vapour condition), 8 (Analysis of soils and fills condition) and 9 (Sustainable Drainage Systems Strategy) with alterations to wording of relevant conditions and the addition of drawings 287_GA1015-A3 and 287_GA3015-A3 to allow the works to be carried out in two separate phases: The vaults to the front of the property will be phase 1 and the rear basement extension will be completed in phase 2.
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 8 Nov 2026.
Data last updated 9 Nov 2026, 07:32 UTC. Councils are the authoritative record and may have changed since.