The source does not give a direct link to this application. Search for reference CON/24/04185 on Royal Borough of Kensington and Chelsea's planning pages, or see the Datahub record (raw JSON).
Details required by conditions 8 (Contamination - Remediation strategy); 11 (Protection of trees during construction - Details required); 13 (Environmental Management Plan) and 14 (Air Quality Dust Monitoring) of planning permission 24/00097 (Excavation to facilitate laying of district heating pipe network. Construction of Warm Water Store to south of Kensington Leisure Centre, adjacent to Bomore Road, including internal and external lighting. Alterations to external appearance of existing Camelford Court boiler room to create a Renewable Boiler Room, including external wall insulation, balustrading, removal of existing chimney stack, signage, external lighting and replacement landscaping. Removal of existing concrete protruding vent structures adjacent to boiler room and replacement hardstanding. Installation of air source and water source heat pumps as a Heat Pump System on roof of Kensington Leisure Centre, with associated decorative and acoustic screen, green wall and ducting. Associated temporary boiler and site compounds. Installation of decorative screen surrounding approved acoustic enclosure on roof of Treadgold House)
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 8 Nov 2026.
Data last updated 9 Nov 2026, 07:32 UTC. Councils are the authoritative record and may have changed since.