Loading application…
Loading application…
The source does not give a direct link to this application. Search for reference CL/24/00120 on Royal Borough of Kensington and Chelsea's planning pages, or see the Datahub record (raw JSON).
Internal alterations, including replacing existing consumer unit with new consumer unit compliant with current regulation. Flush mount existing surface mounted electrical sockets, chase additional wire and install a number of additional electrical sockets/lighting outlets. Testing and electrical certification, floors in bedrooms, living room and hall, replace carpets with engineered wood floors. Install soundproof layer between new engineered wood floor and existing concrete slab floor; replace kitchen with new kitchen with a similar lay-out. Replace floor tiles with new tiles; refurbishment of bathroom fixtures; install water closet/under floor heating (and resulting plumbing), move door opening, separate WC room, demolish part of autoclaved aerated concrete wall to create en-suite entry from the main bedroom, fill-in existing door opening, refurbishment of fixtures, install a new shower (and resulting plumbing). Move washing machine from kitchen to room containing water tank (Certificate of Lawful Proposed Use/Development)
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 8 Nov 2026.
Data last updated 9 Nov 2026, 07:32 UTC. Councils are the authoritative record and may have changed since.