Loading application…
Loading application…
Non-Material Amendment to Conditions 8 (BREEAM Certificates (PRE-COMMENCEMENT)), 14 (Surface Water Drainage (Pre-occupation)), 15 (Surface water network (Thames Water) (Pre-occupation)), 16 (Water network capacity (Thames Water) (Pre-occupation)), 17 (Flood Warning and Evacuation Plan (FWEP) (Pre-occupation)), 19 (Biodiversity (Pre-occupation)), 22 (Living roofs (Pre-superstructure)), 23 (Landscape and ecological management plan (LEMP) (Pre-occupation)), 24 (Energy Strategy (Pre-superstructure)), 25 (DEN Connection (Pre-superstructure)), 28 (Circular Economy (Pre-occupation)), 30 (Secured by Design (Pre-occupation)), 37 (Site Waste Management Plan (PRE-COMMENCEMENT)), 40 (London Underground Asset Protection (PRE-COMMENCEMENT)), 42 (Demolition/Construction Environmental Management Plans (PRECOMMENCEMENT)) and 44 (Management and Control of Dust (PRE-COMMENCEMENT)) of the Berol Quarter Planning Permission (ref: HGY/2025/0930) dated 30 June 2026 - to enable details to be approved under these conditions on a phase-by-phase basis.
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 8 Nov 2026.
Data last updated 9 Nov 2026, 07:32 UTC. Councils are the authoritative record and may have changed since.