Loading application…
Loading application…
Refurbishment of the public realm areas, including removal of damaged concrete paving slabs to the LHS of the site and lifting and retention of remaining good condition slabs; removal of existing damaged concrete paving slabs to the front of the site around the main entrance and re-laying previously retained slabs; removal of existing mature trees and replacement with new smaller trees [completed]; refurbishment of the existing fountain structure and decorative wall; and replacement of defective cobbled areas to front of site.
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 8 Nov 2026.
Data last updated 9 Nov 2026, 07:32 UTC. Councils are the authoritative record and may have changed since.