Loading application…
Loading application…
Full Regeneration of the Royal Observatory Site including (but not limited to) demolition of the existingÿsingle storey ticketing office, installation of newÿentranceÿpavilion on the eastern perimeter of the site with supportedÿgarden walk structure; installation of an external elliptical access stair to the Great Equatorial Building, including new lift and overrun within the Meridian Building;ÿextending the planetarium lobby to create new science engagement space, and connecting to the South Building facade; new access core from the planetarium terrace down to the infilled courtyard; new caf‚ kiosk inÿtheÿAstronomers Garden;ÿremoval of gas boilers and introduction of new air source heat pumps and acoustic enclosure;ÿassociated switch room and relocated bin store on the southern perimeter of the site, new cycle stands, a site wide landscaping scheme, conservation repairs and other associated works [This application affects a scheduled monument and a number of Grade 1 and Grade 2 Listed Buildings]
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 8 Nov 2026.
Data last updated 8 Nov 2026, 16:47 UTC. Councils are the authoritative record and may have changed since.