Loading application…
Loading application…
Removal of deteriorated existing asphalt flat roof and replacement with a new timber frame mono-pitch roof with clay tile finish to match existing local character. UPVC top opening rear bathroom window to be removed and replaced with a new metal frame top hung casement window with obscure glazed finish to prevent overlooking. New metal frame roof light with obscured glazed finish to prevent overlooking. Existing UPVC rainwater pipework drainage removed and replaced with new pipework to match existing. Internal timber stud wall reconfiguration to gain more useable space in bathroom. External fa‡ade to be infilled with new blockwork and refinished to match existing render finish.
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 8 Nov 2026.
Data last updated 8 Nov 2026, 16:47 UTC. Councils are the authoritative record and may have changed since.