Loading application…
Loading application…
Proposed installation of 2no. chiller units, 1no. enclosure for ancillary equipment, 6no. condensing units at roof level, installation of new pipework and louvred grille, removal of 1no. high level window, partial demolition of an existing gas bottle store and replacement of part of an external fa‡ade on the Ground Floor to the North Elevation with a wall panel required for MRI scanner installation, blocking off of windows on the ground floor and installation of obscure glazing to windows on the ground and first floor to serve new Community Diagnostic Centre (CDC) at existing hospital site
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 8 Nov 2026.
Data last updated 8 Nov 2026, 16:47 UTC. Councils are the authoritative record and may have changed since.