Loading application…
Loading application…
Erection of a dormer within the rear roofslope, replacement of existing concrete roof tiles with slate tiles, replacement of existing single-glazed timber sash windows at first, second and third-floor levels and the second-floor rear terrace door with double-glazed units, repositioning and enlargement of one existing rooflight on the front and rear roofslope, installation of a walk-on rooflight and glazed lantern at rear terrace level, removal of the existing first-floor rear garden balcony and installation of a metal planter tray and associated works.
Not yet classified. Classification reads only the description above and shows the quoted passage for every value.
The source does not list documents, or they are only on the council’s own page. We link to documents; we never copy them.
No changes since we first saw this application on 25 Oct 2026.
Data last updated 9 Nov 2026, 07:32 UTC. Councils are the authoritative record and may have changed since.